From the RVM handbook
Glossary
The 32 terms we use most in maintenance, reliability and asset management, each briefly explained. They come from TMB's RVM handbook.
RVM — Reliability Value Model
TMB's asset management model. Five building blocks that translate risk into value.
Value axis (line of sight)
The vertical line of translation from intervention to business value, readable in both directions.
Criticality
The ranking of assets by risk (probability × consequence); it sets the depth of analysis per asset.
RCM
Reliability Centered Maintenance — a method for determining reliability-based maintenance (SAE JA1011/1012).
FMEA / FMECA
Failure Mode (Effects and Criticality) Analysis — a structured analysis of failure modes, their effects and their criticality.
P-F curve
The interval between the detectable onset of failure (P) and functional failure (F); the basis for CBM intervals.
CBM / TBM
Condition-Based / Time-Based Maintenance — condition-driven versus time-driven maintenance.
Value driver
One of the five forms in which reliability creates value (D1–D5).
ISO 55001
International standard for asset management; it provides the model's governance and PDCA structure.
ISO 14224
Standard for the collection and exchange of reliability and maintenance data.
IEC 61511
Standard for the functional safety of safety instrumented systems in the process industry.
Seveso III · ATEX
European framework for major-accident hazards (Seveso) and explosion safety (ATEX).
Maturity ladder
The five levels Foundation, Contrôle, Systemized, Proactive and Strategic — 33 building blocks in total.
Wrench time
The share of a technician's working time spent on actual hands-on work. Zones: reactive <25%, typical 25–35%, planned 35–55%, world-class >55%.
OREDA
Offshore & Onshore Reliability Data — a reference database of failure data, used as a source in TMB analyses.
Source attribution
TMB principle whereby every claim in an analysis carries its origin (OEM, OREDA, ISO 14224, standard, sector, estimate).
RCA
Root Cause Analysis — a structured investigation of the root cause after a failure; a building block of the Systemized level.
TPM
Total Productive Maintenance — a production-wide maintenance philosophy with autonomous maintenance; a building block of the Strategic level.
Learning gap
The gap between insight and action — the main reason digital and AI initiatives in industry fail.
Industry 5.0
European vision for industry built on three pillars: human-centricity, sustainability and resilience.
Failure patterns (Nowlan & Heap)
The six archetypal curves of failure probability over time; most failure modes are not age-related.
Bathtub curve
Failure pattern A: infant mortality, followed by a stable phase and a wear-out zone.
Infant mortality
Increased probability of failure shortly after installation or an intervention — failure pattern F, the most common one.
Priority classes P1–P4
Risk-based work order classes, each with its own response window, from immediate (P1) to bundling with a shutdown (P4).
Backlog
The stock of identified and prepared work; read as a management tool in weeks of capacity.
Schedule compliance
The share of the weekly schedule that was actually carried out as planned.
5-Why
RCA method that moves from symptom to latent cause by repeatedly asking why.
Ishikawa diagram
Fishbone diagram that groups candidate causes by category; well suited to team analysis.
Fault tree analysis (FTA)
Top-down analysis of which combinations of basic causes lead to an undesired top event.
Barrier analysis
RCA method that examines which safety barrier failed, was missing or was weakened.
AI Reliability Co-pilot
TMB's AI foundation that speeds up FMECA, criticality and PM optimisation — with the engineer making the final decision.
Applying these terms in your plant?
We translate them to your installations: from criticality to a maintenance plan that works.